Cycle detail (planned)

v0.14.6 — Forward roadmap audit.

The next Beemuu cycle. Doc-rotation close-of-cycle mirroring the v0.14.4 audit pattern (PRs #198 + #200). The plan doc opens with this PR; the per-PR detail will be updated here as the cycle lands.

v0.14.6PlannedTier AForward roadmap audit

Candidate slice

The v0.14.6 cycle is single-slice. The work is docs-only and is the close-of-cycle pattern the v0.14.4 "Story Coverage" cycle established (PRs #198 + #200: CLAUDE.md invariants refresh + ROADMAP v0.3.0 historical audit).

  • v0.14.5 doc-rotation closeout — the actual work. Updates 4 files: ROADMAP.md v0.14.5 cycle block (In Progress → Shipped with ✅ Done rows for PRs #222 / #223 / #224 / #225), this forward-roadmap doc (v0.14.4 + v0.14.5 entries closed out), the public frontend/roadmap/v0.14.5.html (planned → shipped + "What shipped" section + install link to the v0.14.5 release), and a new docs/v0.14.6_plan.md (the v0.14.6 cycle plan doc per the established docs/v0.14.x_plan.md convention).

Open questions

For the maintainer:

  1. Is the v0.14.6 release cut a separate PR?

    Per CLAUDE.md golden rule #5 ("don't let the badge lie"), the README release badge reflects the most recent fully shipped release. A docs-only cycle still counts as shipped for the badge; the v0.14.6 release cut is therefore a separate Tier C PR (mirror of PR #225) that bumps the version surface to 0.14.6. Default: yes, the v0.14.6 release cut is a separate PR.

  2. Should the v0.14.6 cycle also fix the release.yml landing-page step?

    The v0.14.5 release run (#30738207436) failed at the "Update beemuu.com landing page" step because the BEEMUU_VPS_SSH_KEY / BEEMUU_VPS_HOST secrets aren't configured in the repo. The v0.14.6 cycle could ship a release.yml change that makes the landing-page step best-effort + documents the secret-requirements in a new docs/ops/release-yml-secrets.md. Default: yes, ship the docs change in v0.14.6 alongside the audit PR.

Contribute

If you have a slice in mind, open a PR against main on the Beemuu repo. The maintainers will either merge it directly (Tier A) or roll it into the next cycle's plan doc.

FAQ

When does v0.14.6 start?

When the v0.14.5 release cut lands — the v0.14.5 release shipped 2026-08-02 at commit 5743348 on origin/main. The v0.14.6 plan doc is the first PR of the cycle.

Can I work on a candidate slice right now?

Yes. Open a PR against main. If the slice is in the v0.14.6 candidate list, the maintainers will route it appropriately.

Propose a slice.

If you have a candidate slice in mind, open a PR. The maintainers will route it.

Open an issueContributing

Last updated: 2026-08-02 · Beemuu contributors